Portimao blue, open pore oak, oyster leather, 792M with summer runflats
All options minus track package and spare tire
*Note: Another dealership was not willing/able to reconfigure an existing allocation they had and I would have waited 6-8 weeks before the build even started had I ordered from them
- Order Received 7/8
- Scheduled For Production 7/8
- Production Begins 7/9
- Exterior Body Assembly Begins 7/16
- In Paint Booth 7/16
- Entering Assembly Line 7/17
- Assembly In Progress 7/18
- Quality Check 7/18
- Final Assembly 7/18
- Ready For Transport 7/18
- Awaiting Carrier Assignment 7/18
- Dispatched From Factory 7/19
- At The Port 7/25
- In Transit 7/29
- At The Port USA 8/16
- In Transit 9/6 (delayed by a recall and a hurricane)