Quote:
Originally Posted by DSB335d
Quote:
Originally Posted by RickFLM4
Install started today. Gonna take 5 full days for everything.
|
Nice! I'm having some Storm Tight windows installed around the end of the month.
|
Good luck. It is messy and loud!
For the most part they do a good job covering stuff including the floor and furniture, but there is a lot of dust. At least for our house, the have to cut through concrete block because the impact glass and frames are thicker than what is being replaced.