View Single Post
      08-28-2019, 09:09 AM   #25
Dinan_Engineering
Brigadier General
Dinan_Engineering's Avatar
United_States
3910
Rep
3,129
Posts

Drives: Any BMW
Join Date: Jun 2013
Location: Opelika, AL

iTrader: (0)

Quote:
Originally Posted by Cabby View Post
ETA???
Design is finalized but it requires new bulkheads to be manufactured so we are at the mercy of of that process currently. Typically a 6-8 week ordeal for that component. Assuming all the other pipes and what not are in when those arrive, we are looking at about 2 months out. This is assuming everything goes as it should though, which it rarely does, so I wouldn't put money on that or anything.
Appreciate 0