Ordered a M340xi that was assigned to "Production Begins" on 8/5 but has not changed since then. When I called the BMW genius they gave me an estimated build completion of 9/2, which seems oddly long. My vehicle has a VIN number already which makes me think it has to be somewhere along the production process.
Has anyone else had this issue or had the build status stuck for over a week at a time? Thanks in advance.
|