04-10-2024, 04:38 PM | #441 | |
New Member
404
Rep 27
Posts |
Quote:
Yes.......my current time-line: • Purchase Agreement....................................01/12 • March Allocation Aquired ............................01/29 • 111 - Order Accepted....................................01/29 • 150 - Production Begins...............................03/15 (VIN Assigned) • 151 - Exterior Body Assembly Begins..........03/22 • 152 - In The Paint Booth...............................03/25 • 153 - Entering Assembly Line.......................03/26 • 154 - Assembly in Progress..........................03/26 • 155 - Quality Check........................................03/26 • 156 - Final Assembly......................................03/26 • 160 - Ready For Transport.............................03/26 • 180 - Awaiting Carrier Assignment...............03/26 • 190 - Dispatched from Factory.....................03/26 • 193 - At The Port (POE)..................................04/02 • 195 - In Transit........................................... ....04/09 (Vessel: Polaris Highway) EDA Brunswick Port: 04/27
__________________
2024 BMW M440ix Gran Coupe -SRG Metallic (In Transit)
2006 CTS Sport, 6 Spd - Blackberry 2003 F-150 Harley-Davidson 100th Anniv. Edition - Black 1988 Conquest TSi, 5 Spd - Black Last edited by ShapeShifter; 04-10-2024 at 05:23 PM.. |
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|