03-09-2023, 01:29 PM | #5325 | |
Battle Scarred Veteran
273
Rep 365
Posts |
Quote:
|
|
Appreciate
0
|
03-10-2023, 11:27 PM | #5326 |
Second Lieutenant
173
Rep 275
Posts |
The wait is over!!
My new G26 is here. Going to get the wheels powder coated then pick it up. Doing paperwork tomorrow and checking to make sure everything I ordered is on the car. They sent me pictures. Looks pretty nice. No deletes, no shipping damage. Car is loaded with everything except cooled front seats which are not available in the red leather for some weird reason. Some port installed items. I really like the MPerformance spoiler and door sills. I have RW Carbon DTM Splitter going on as well as new dimpled and slotted MPerformance rotors, Dinan CAI, Dinan strut bars powder coated red, PPF, window tint. Then - I am done for now as I am out of cash!!
Timeline summary - ordered in December and delivered today. I will post additional pics when everything is on the car. |
Appreciate
3
|
03-11-2023, 05:49 PM | #5327 |
New Member
2
Rep 6
Posts |
The wait begins!
Joining the family
330e, Dravit Grey Metallic, 19" Jet Black, Black Perforated Sensatrac, Shadowline, M Sport Pro, blue calipers deposit 3/11 |
Appreciate
0
|
03-11-2023, 11:20 PM | #5328 |
Registered
0
Rep 2
Posts |
M340i xdrive. Skyscraper. Cognac interior.
Order date 2/1. Waiting for transport since 2/27. Awaiting carrier assignment. Built in SLP MX. Shipping from Lázaro Cárdenas to Port Hueneme. Anyone else waiting for a west coast shipment? |
Appreciate
0
|
03-12-2023, 08:46 AM | #5329 |
Enlisted Member
17
Rep 35
Posts |
Updated
M340i xdrive Skyscraper / Tacora Red leather Order Received - 1/2/23 Scheduled For Production - 2/9/23 Production Begins - 2/27/23 (VIN) Exterior Body Assembly Begins - xxx In Paint Booth - xxx Entering Assembly Line - 3/8/23 Assembly In Progress - 3/9/23 Quality Check - 3/9/23 Final Assembly - 3/10/23 Ready For Transport - 3/11/23 Awaiting Carrier Assignment - Dispatched From Factory - At The Port - In Transit - At The Dealership - Vehicle Delivered - From what I gather, this would suggest that it could be on the next East Coast-bound vessel that arrives at Veracruz on or after ~3/14 (3 days after “ready for transport”). Is that correct? Last edited by drzep; 03-12-2023 at 08:54 AM.. |
Appreciate
0
|
03-12-2023, 09:58 AM | #5330 | |
Monkeyman8
132
Rep 165
Posts |
Quote:
M340ix - Skyscraper/Tacora/all options except cooling and high performance tires. Deposit Placed - Late Dec. 2022 Order Accepted - 2/7/23 Scheduled for Production - 2/8/23 Production Begins - 2/27- VIN Issued Exterior Body Assembly Begins - skipped In the Paint Booth - skipped Entering Assembly Line - skipped Assembly in Progress - 3/7 Quality Check - 3/8 Final Assembly - 3/9 Ready for Transport - 3/12 Awaiting Carrier Assignment - ? Dispatched from Factory - ? In Transit - ? At the Port - ? In Transit - ? At the Dealership - ? Vehicle Delivered - |
|
Appreciate
0
|
03-12-2023, 06:37 PM | #5331 |
Private
69
Rep 62
Posts
Drives: 2023 BMW M340i xDrive
Join Date: Mar 2023
Location: MN
|
Might as well toss my hat into the ring here.
M340i xDrive: Dravit Grey Metallic, Black Vernasca Leather, all options except cooling/high performance package. Was told I have an April allocation secured. Scheduled for Week 16. Ordered: 2/28 Order Received: 3/16 Production Begins: 4/3 Exterior body assembly: - In the paint booth: - Entering assembly line: - Assembly in progress: 4/21 Quality check: 4/21 Final assembly: 4/21 Ready for transport: 4/25 Awaiting carrier assignment: 5/30 Dispatched from factory: - At the port: 5/30 In transit: 5/30 At the port: 6/11 In transit: 6/18 At the dealership: 6/20 Delivery: 6/23 My rep called me on 4/21 to say that my car is waiting to be shipped, even though the garage is stuck at final assembly for the past couple days. So, we'll see. Last edited by prjkthack; 06-23-2023 at 08:10 PM.. |
Appreciate
0
|
03-12-2023, 07:16 PM | #5332 |
New Member
6
Rep 11
Posts |
M340i Tanzanite Blue
New here,
M340ix - Tanzanite Blue II metallic Deposit Placed - 2/923 Order Accepted - 2/14/23 Scheduled for Production - 2/14/23 Production Begins - 2/27/23 Entering Assembly Line - 3/8 Assembly in Progress - 3/8 Quality Check - 3/9 Final Assembly - 3/9 Ready for Transport - 3/11 Awaiting Carrier Assignment - TBD and next steps are TBD as well |
Appreciate
0
|
03-13-2023, 04:26 AM | #5333 |
Private
66
Rep 89
Posts |
My 2023 430i gran coupe is here!! Here’s the final timeline
Order received - 12/13 Scheduled for production - 12/13 Production begins - 12/17 Exterior body assembly begins - 12/22 In the paint booth - 12/22 Entering assembly line - 01/16 Assembly in progress - 01/16 Quality check - 01/16 Final assembly - 01/16 Ready for transport - 01/16 Awaiting carrier assignment - 01/16 Dispatched from factory - 01/16 At the port - 01/20 (in germany) In Transit - 01/31 At the port (hueneme, California) - 02/26 In Transit (to dealership) - 03/10 At Dealership - 03/11 Vehicle Delivered - 03/12 After some damage and about a week delay from the original date. She’s finally here! My first bmw and wow is all I can say~ so excited to drive this thing, it’s smooth and so nimble. I didn’t know I would have puddle lights, kick to open tailgate, and the digital key card 😊 so was very happy to see those things |
03-13-2023, 02:30 PM | #5334 |
Battle Scarred Veteran
273
Rep 365
Posts |
It is an awesome color btw - does that color delay the delivery date still? We ordered a different color because we need the car ASAP.
|
Appreciate
0
|
03-13-2023, 07:49 PM | #5335 | |
Private
69
Rep 62
Posts
Drives: 2023 BMW M340i xDrive
Join Date: Mar 2023
Location: MN
|
Quote:
And yeah, I love the dark gray color. The gold was a little off putting at first, because in the showroom light it was really showing through, but once I took it outside in more normal light it became this discreet and hidden character of the car and I made up my mind then. Last edited by prjkthack; 03-13-2023 at 07:55 PM.. |
|
Appreciate
1
benz330e272.50 |
03-17-2023, 08:49 AM | #5336 |
New Around Here
7
Rep 32
Posts
Drives: 2023 330i X-Drive (On Order)
Join Date: Jan 2023
Location: Philadelphia, PA
|
I have had a winding road to get here.
Originally placed an order for a 2023 330e xdrive on Jan 6, 2023 and was told March build but I didn't realize they didn't actually have an allocation. They were going on the assumption they would get an allocation. As of March 10th they had still not received one. I found another dealer that had a car on order similar to what I wanted so I called. It was a customer order so it was not available but they told me they had a car sitting in status 112 with a week 15 build and it was mine if I wanted it. I jumped at that. The only difference is that it is a 330i xDrive instead of the 330e. I think I really lucked out. Below is current status and details. 330i xDrive Brooklyn Grey Metallic Black Perforated SensaTec M Sport All Black Rims Extended Shadowline Trim DAPP PAP Here is the status thus far... Order received - 3/14 Scheduled for production - 3/14 Production begins - 3/31 Planned Assembly Week 15 Original Prod Date (F12 trick) - 4/13 moved up to 4/12 Exterior body assembly begins - 4/12 In the paint booth - 4/12 Entering assembly line - 4/12 Assembly in progress - 4/12 Quality check - 4/12 Final assembly - 4/13 Ready for transport - 4/14 Awaiting carrier assignment - N/A Dispatched from factory - N/A At the port - N/A In Transit - 4/28 (Grand Pioneer - left Veracruz, anchored for 3 days, came back to Veracruz again before actually leaving on 5/4 for Altamira) Stop in Altamira - 5/4 to 5/8 Stop in Brunswick - 5/14 - 5/15 At the port (Sparrows Point - Baltimore) - 5/17 (BMW website updated on 5/18 with at the port) In Transit (to dealership) - At Dealership - Vehicle Delivered - Last edited by chrisbix36; 05-19-2023 at 01:59 PM.. Reason: Added new updates. |
Appreciate
0
|
03-22-2023, 04:16 PM | #5337 |
New Member
17
Rep 23
Posts |
Update
M340i Sedan
Portimao Blue Metallic Canberra Beige Perforated Sensa Tec Order placed 2/3/23 Scheduled for Production 2/10/23 Production begins 3/9/23 Exterior Body Assembly Begins 3/22/23 In the Paint Booth 3/22/23 Entering Assembly Line 3/22/23 |
Appreciate
0
|
03-23-2023, 06:39 AM | #5338 | |
Battle Scarred Veteran
273
Rep 365
Posts |
Quote:
Did you actually see the Exterior Body Assembly Begins and In the Paint booth steps? I tell you that I can’t imagine anyone checking as often as I do and I didn’t see those 2 steps yesterday. This AM it says Final Assembly |
|
Appreciate
0
|
03-23-2023, 07:41 AM | #5339 |
Private First Class
140
Rep 181
Posts
Drives: 2023 M340xi Portimao Blue
Join Date: Aug 2018
Location: FL
|
Mine skipped both of those steps as well and I was checking daily at a minimum. It's likely because the site lags behind a few days.
|
Appreciate
0
|
03-23-2023, 04:26 PM | #5340 | |
New Member
17
Rep 23
Posts |
Quote:
My SA told me the actual build takes about 50 hours from start to finish, so I am not surprised by the progress, |
|
Appreciate
0
|
03-24-2023, 01:32 AM | #5341 |
Registered
2
Rep 1
Posts |
Hey y'all! First post here! I've really appreciated watching this thread for the last couple months while my new 330e has been on order. It's finally on a boat and I figured I'd share for anyone else's car that might be on my transport.
2023 330e, Brooklyn Grey, Cognac Sensatec, All options minus xDrive, Adaptive Suspension Ordered in Los Angeles Ordered 2-1-12, dealer didn't actually put order in for another 5 days uugh 2-23-23: scheduled for week 10 Status 112 - scheduled for production 2-24-23: Production Begins VIN Assigned 3-4-23: Exterior Body Assembly Begins In the Paint Booth Entering Assembly Line 3-6-23: Assembly in Progress 3-7-23: Quality Check Final Assembly 3-13-23: Final Assembly (AM) Ready for Transport (PM) 3-20-23: Called BMW Genius Line but they had no better status and said cars from Mexico don't really show tracking en route from factory to port, show as In Transit when on boat 3-22-23: Awaiting Carrier Assignment Dispatched from Factory At The Port In Transit: Aphrodite Leader ETA Port Hueneme/Oxnard 3-26 Looks like the boat is making a stop tomorrow in Long Beach. Not sure how long these normally stay in port for. |
Appreciate
1
pdiddy0.00 |
03-24-2023, 10:09 PM | #5342 |
New Member
15
Rep 8
Posts |
Picked up my 330i yesterday! The time from placing the order to taking delivery was about 7 weeks for me. Final timeline for my order:
Order Received - 2/3 Scheduled for Production - 2/3 Production Begins - 2/7 Exterior Body Assembly Begins - 2/15 In the Paint Booth - 2/15 Entering Assembly Line - 2/15 Assembly in Progress - 2/16 Quality Check - 2/16 Final Assembly - 2/16 Ready for Transport - 2/17 Awaiting Carrier Assignment - 2/27 Dispatched from Factory - 2/27 At the Port (Mexico) - 2/27 In Transit - 2/27 At the Port (NJ) - 3/18 In Transit (To dealership) - 3/21 At the Dealership - 3/22 Vehicle Delivered - 3/23 I asked the dealership not to wash/prep the car during the PDI which is why it looks dirty and still has the protective wrapping. Will be taking the car to a detailer in a few days for a ceramic coating. |
Appreciate
2
Geo_FF140.00 djmattbain.eth127.50 |
03-25-2023, 10:07 AM | #5343 |
Private First Class
128
Rep 116
Posts
Drives: 2023 BMW 330e xDrive
Join Date: Nov 2022
Location: Chicago
|
Finally!!! I placed my order on November 16th, just got to order received
|
Appreciate
0
|
03-25-2023, 12:04 PM | #5344 | |
Private
35
Rep 75
Posts |
Quote:
I know allocations are always constrained but this seems ridiculous. In 5 months, you should’ve already been at “Scheduled for Production” or better yet even have your car by now. |
|
Appreciate
0
|
03-25-2023, 12:53 PM | #5345 | |
Enlisted Member
15
Rep 30
Posts |
Quote:
|
|
Appreciate
0
|
03-25-2023, 12:56 PM | #5346 | |
First Lieutenant
211
Rep 345
Posts |
Quote:
|
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|